SERVICES

Merging Parcels

About Merging Parcels

Examining the merging of contiguous parcels owned by the same owner and bearing the same approved zoning according to the approved zoning maps.

Entities Participating in Approval:

Ministry of Works (MOW):

  • Sanitary Engineering Planning & Projects Directorate (SEPPD)
  • Roads Planning & Design Directorate (RPDD)
  • Central Planning Office (CPO)

Electricity & Water Authority (EWA)

  • Electric Distribution Directorate (EDD)
  • Water Distribution Directorate (WDD)
  • Planning & Studies Directorate Electricity (PSDE)
  • Planning & Studies Directorate Water (PSDW)

Ministry of Transportation & Telecommunications (MTT)

  • Ministry of Transportation & Telecommunications (MTT)

Telecommunications Regulatory Authority (TRA)

  • Telecommunications Regulatory Authority (TRA)
  • Bahrain Telecommunication Network (BNET)

Bapco Energies

  • Bapco Energies
  • Bahrain Petroleum Company (BAPCO)
  • Bapco Upstream
  • Arab Ship Building & Repair Yard (ASRY)

Application Requirements :

Please note that submission of this request is permitted only through approved engineering offices .

Conditions:

  • Submission through approved engineering offices.
  • All parcels must have the same owners names in case of joint ownership.
  • All parcels must have the same zoning.
  • The zoning must be approved according to the approved zoning maps.

Required Documents:

  • A copy of the title deed.
  • A copy of the owner's smart card (both sides) or a copy of the commercial registration for organizations and companies.
  • A digital copy of the propsed merging plan (AutoCAD/MicroStation).
  • A map of the proposed merging plan signed by the land owner. If the land has multiple owners, all owners must sign the map.
  • A copy of the latest survey certificate.

Type of project to be built for classification/reclassification requests within the project areas of a special nature.

If the land is within an approved plan (Durrat Al Bahrain, Diyar Al Muharraq, Amwaj Island, Bahrain Bay):

  • A copy of “Special Nature Projects Review Committee” approval.
  • A copy of the land-use table.

If the land is at sea:

  • A copy of the reclamation completion certificate from the relevant municipality (for marine land).

If the applicant is authorised to represent the owner:

  • A copy of the authorization letter.
  • The authorized person’s smart card.

If the applicant is a company:

  • A copy of the Commercial Register of Companies and Companies with the Registry Extracts among those authorized to sign.
  • A copy of the authorization letter.
  • The authorized person’s smart card (authorized to follow up on the application).

If the applicants are heirs:

  • A copy of the legal obligation.
  • An authorization letter signed by the heirs.
  • Smart card copies of all legitimate heirs.
Apply